Monday, October 19, 2009

Shoulda, woulda, coulda T-27 days

I really should be knitting but I am cold and tired and just ready for bed. I have been slowly working on my sugar maple socks. Done two at a time on my 40" 2.5mm options. Monday is the normal knitting night but as tomorrow is the big monthly knit group we have decided to forgo the bar tonight. But on the plus side; I have started to log my stash on ravelry. Another long term project is to get it all photographed and logged. The new yarn is just begging to be knit up and I found the perfect project for some of it. Maybe the new yarn that should be arriving in the mail any day will have the same effect and I will be able to finish J's dress.

Friday, October 16, 2009

That bad four letter word T-30 days again

S A L E. Here I've talking about destashing and trying to use up whatever I can as I have run out of room in my bins. So what happens when someone mentions on ravelry that a local store has bernat satin on for buy one get one free. My favorite acrylic on for basically half price.

So 10 skeins came home with me. Along with another 1lb ball of cotton. But there is big plans for that very large ball of cotton. Hubby has asked me to do a stash bathmatt for his mother for christmas. Since I use 2 strand of cotton I like to use the big ball for keep one colour constant throughout the matt and that also reduces the number of ends that I have to weave in. I am thinking that this will make a good work project as it is straight garter stitch.

Hit List - T-30 days

I have several skeins in my stash that I have picked over the years and need to use for something. Since part of this project is to use up some stash yarns. I have started a hit list. Starting with about 12 skeins (there may actually be more) of patons pearl twist in pink (9 skeins) and white (3 skeins). Also part of a 1lb cone of Lily's cream and sugar cotton. I have probably done 10 dishcloths already out of the cone and there is still quite a bit left.

My Sugar maple socks are very slowing coming along. I am finding that they are a little to finicky for work knitting but so far I have held out on starting a new project.

Tuesday, October 13, 2009

Itchy Fingers T-33 days

With J's dress sitting in wait until the new yarn arrives. The socks have gotten a little bit more done on them. But they are just not working for me lately. I look at new patterns and want to get something new started. I have been trying really hard not to start a new project as I do have several on the do. I have a baby Yoda jacket that just needs to be seamed. Also a baby blanket that I have been working on for over 2 years and a pair of mittens that I am just about to start the thumb.

I did pull out that baby blanket and put about 5 rows on it last night. Its a cool rainy - gray day so the kids and I are staying put and hopefully I will get some things done while the little one naps.

Sunday, October 11, 2009

Hiatus T-35 days

I was able to do some knitting at work between yesterday and today. Yesterday I finished the skirt part of J's dress. And worked on socks today. The dress is on hiatus until I order some more yarn as I have very little left and lots of knitting still to do. With the new yarn I think I am going to change it from an empire waist to a more natural one.
J's dress

skirt detail
100_1806

dress link

Done in Mary Maxim starlette worsted weight. colour Aqua on my 5.5mm addi's.

Wednesday, October 7, 2009

Trying - T-38 days i think

It has been a trying couple of days. Between crazy kids and trying to fix a couple of mistakes it was a very long day. I realized that I had messed up an increase which was quite noticeable. Weird for me I'm not one to go back a correctly unless its really bad. It was about 7 rows down and when you are dealing with over 200 stitches per row I was not ripping those rows out. Also I was 13 inches in on a 14 inch section. So I tinked about 9 or 10 stitches for those 7 rows and knit them back up and then realized I had a twisted stitch so back down I when and finally got it fixed. Knitted along and then had to many stitches in another section. so down I when again and finally got that fixed. It would be so bad but this project is rather interesting but I am about to run out of yarn. I have almost finished the skirt and done both sleeves and have less than half a skein left to do the bodice, neck and bottom bands. It would be so bad if I hadn't gotten the kit almost 2 years ago. If I had knitted it up when I received it it would have been fine as I would have be doing the size 2 instead of the size 4. so I'm going to order another skein in the same colour and just do the skirt and sleeves in one dye lot and the bodice in the other.

I'm to tired to go looking for pictures tonight. Maybe tomorrow.

I did pick up another ball of cotton; like I really needed another but I do find that some colours are harder to kind than others. so when I saw a lovely bright red solid it quickly when into the cart. Also like that is double the size of most of the cotton skeins that I have.

Happy Knitting

Monday, October 5, 2009

Flash the Stash - T-40ish days

Batteries are charged. Pictures have begun.

The Main Stash:
100_1817

The mainly wool bin with some alpaca and the overflow of acrylic:
wool bin  (with some extras)

The acrylic and cotton bin:
Acrylic and Cotton bin

As you can see I had "help".