Tuesday, February 9, 2010

Catching up

January 4 2010

January for me is a need to simplify things, use up what I have and clean up what is around me. Its strange I do with my tea selection. I know it seems really weird but every once in a while I go through and try to use stuff up. Maybe as a way to justify getting more. It seems to be the same way with yarn lately. I have some bigger projects that are either on the go and should be started soon, but I can content just to do dishcloths. Maybe it is just being around all the cotton at work as they are the preferred project there. Or it could just be the need to go back to basic’s. So far in the last few days at work I have done a granny’s fav in lily n cream mistletoe which was given away as soon as it was done. I have also finished another in bernat handcrafters’ cotton in swimming pool. This one still needs the ends weaved in which I will do once I find my needles. The rest of the ball of swimming pool has started a cutting edge but I have to set that one aside as my other ball of cotton is sitting in my desk at work. I need to ball a skein of pink cascade 220 for J’s slippers and also the very large skein of Eco wood for my new mitts.

I also said I would do a blanket for a new baby due March 26th. I think the colour will be the same as A’s but I will get another bunch of yarn for it. I know I could just finish hers and give it but since it is a gift I want to use the same dye lot for the entire project. This maybe another reason for just working on simple things lately as I have to wait until Friday to go get the yarn and then it will be a rush to finish the blanket in time.

With the addition of 7 skeins of Cascade 220 and the ball of eco wool has really strained the yarn storage and thus another reason to try to work through some stuff. I know that a order from Knitpicks needs to be done some either the end of Jan or beginning of Feb depending on pay. I need a couple of balls of swish DK to finish J’s dinosaur and the ball winder is a big thing as the one I could buy locally is double the price once you factor in exchange and shipping. I may order another set of sock needles and some needle ends but will see.

Jan 12, 2010

Knitting has taken a backseat to a headache this week. So not a lot done, still working on the cutting edge dishcloth. I did make it to the store on Friday and pickup enough yarn for the baby blanket. Cast on sat morning and was able to get the border finished that night. I was doing quite well on it at work on Sunday, not so busy phone time gives me a lot of knitting time. But then I realized I had picked up and starting knitting the wrong way 2 rows before, so a lot of tinking starting. Once that was corrected it seems to put along. I can see how much my knitting speed has increased in the last few years. On the last blanket that I did which was 2 years ago it figured more than 20 minutes a row. Now it is working out to be 15 minutes a row. This works out to an hour a block, Two hours a week and this blanket will done right around the time this kiddo is born (as long as it doesn’t come two early). I have started J’s ballerina slippers and finished the sole of one. I just to pick it up and have some time to concentrate on it. Maybe if the kids are in bed in good time and I finish the blanket rows that I need to finish tonight.

Jan 25, 2010

The blanket is coming along well. I figure I’m about a week and a half ahead of schedule. But that is a good thing as I know things will slow down once I get further into it. Its also nice to know that the baby shower will be after the little one arrives. Its funny how people at work like to ask about it. One checks to see how much I have gotten done each Sunday. I did get a little baby hat done last week but gave it away before I took any pictures. So just to document and also to have another baby hat is standby I have started other. Using three colours of stash swish worsted in ocean deep and a green and yellow that have lost their ball bands it will knit up quickly. Cast on 64 stitches on 3 ½ mm and did 6 rows of 1by 1 ribbing. Switching to 4 ½ mm and stocking stitch work up the hat in the pattern of 2 rows of main colour (blue) three of green, two blue, three yellow. Once the hat measures 4 ½ inches from cast off starting decreasing in knit 6, K2tog rep to end of row K 1 row, K5, K2tog to end of row. Knit 1 row. Repeat this pattern decreasing the number of stitches between the k2tog by 1 each time. Once there are 6 stitches left on the needles cut yarn and thread yarn through those stitches and tighten. Still working on both the dishcloth and J’s slippers. I| will do a row once in a while but not enough to even notice a change. I have balled up the very large skein of eco wool so that is ready to go for either a hat and mitts or a scarf. That process did make the decision that I will be ordering a swift as well. This will put the order up a lot so It just delays it a bit longer. This also gives me time to work at getting some of my stash knit up. I am still trying to get everything into the three totes and that will include storing the swift and ball winder. I am thinking that right now if everything was together it would fill a fourth tote as well. I should be onto the 3rd ball of yarn for the baby blanket tonight so that will be another ball out of the overflow

This month has been so crazy with weather. Middle of January and it has been over freezing several times. We have had pouring rain since last night and that has removed any snow that we had. I’m not sure if this is going to continue into feburary or if we will be hit hard then.

Monday, October 19, 2009

Shoulda, woulda, coulda T-27 days

I really should be knitting but I am cold and tired and just ready for bed. I have been slowly working on my sugar maple socks. Done two at a time on my 40" 2.5mm options. Monday is the normal knitting night but as tomorrow is the big monthly knit group we have decided to forgo the bar tonight. But on the plus side; I have started to log my stash on ravelry. Another long term project is to get it all photographed and logged. The new yarn is just begging to be knit up and I found the perfect project for some of it. Maybe the new yarn that should be arriving in the mail any day will have the same effect and I will be able to finish J's dress.

Friday, October 16, 2009

That bad four letter word T-30 days again

S A L E. Here I've talking about destashing and trying to use up whatever I can as I have run out of room in my bins. So what happens when someone mentions on ravelry that a local store has bernat satin on for buy one get one free. My favorite acrylic on for basically half price.

So 10 skeins came home with me. Along with another 1lb ball of cotton. But there is big plans for that very large ball of cotton. Hubby has asked me to do a stash bathmatt for his mother for christmas. Since I use 2 strand of cotton I like to use the big ball for keep one colour constant throughout the matt and that also reduces the number of ends that I have to weave in. I am thinking that this will make a good work project as it is straight garter stitch.

Hit List - T-30 days

I have several skeins in my stash that I have picked over the years and need to use for something. Since part of this project is to use up some stash yarns. I have started a hit list. Starting with about 12 skeins (there may actually be more) of patons pearl twist in pink (9 skeins) and white (3 skeins). Also part of a 1lb cone of Lily's cream and sugar cotton. I have probably done 10 dishcloths already out of the cone and there is still quite a bit left.

My Sugar maple socks are very slowing coming along. I am finding that they are a little to finicky for work knitting but so far I have held out on starting a new project.

Tuesday, October 13, 2009

Itchy Fingers T-33 days

With J's dress sitting in wait until the new yarn arrives. The socks have gotten a little bit more done on them. But they are just not working for me lately. I look at new patterns and want to get something new started. I have been trying really hard not to start a new project as I do have several on the do. I have a baby Yoda jacket that just needs to be seamed. Also a baby blanket that I have been working on for over 2 years and a pair of mittens that I am just about to start the thumb.

I did pull out that baby blanket and put about 5 rows on it last night. Its a cool rainy - gray day so the kids and I are staying put and hopefully I will get some things done while the little one naps.

Sunday, October 11, 2009

Hiatus T-35 days

I was able to do some knitting at work between yesterday and today. Yesterday I finished the skirt part of J's dress. And worked on socks today. The dress is on hiatus until I order some more yarn as I have very little left and lots of knitting still to do. With the new yarn I think I am going to change it from an empire waist to a more natural one.
J's dress

skirt detail
100_1806

dress link

Done in Mary Maxim starlette worsted weight. colour Aqua on my 5.5mm addi's.

Wednesday, October 7, 2009

Trying - T-38 days i think

It has been a trying couple of days. Between crazy kids and trying to fix a couple of mistakes it was a very long day. I realized that I had messed up an increase which was quite noticeable. Weird for me I'm not one to go back a correctly unless its really bad. It was about 7 rows down and when you are dealing with over 200 stitches per row I was not ripping those rows out. Also I was 13 inches in on a 14 inch section. So I tinked about 9 or 10 stitches for those 7 rows and knit them back up and then realized I had a twisted stitch so back down I when and finally got it fixed. Knitted along and then had to many stitches in another section. so down I when again and finally got that fixed. It would be so bad but this project is rather interesting but I am about to run out of yarn. I have almost finished the skirt and done both sleeves and have less than half a skein left to do the bodice, neck and bottom bands. It would be so bad if I hadn't gotten the kit almost 2 years ago. If I had knitted it up when I received it it would have been fine as I would have be doing the size 2 instead of the size 4. so I'm going to order another skein in the same colour and just do the skirt and sleeves in one dye lot and the bodice in the other.

I'm to tired to go looking for pictures tonight. Maybe tomorrow.

I did pick up another ball of cotton; like I really needed another but I do find that some colours are harder to kind than others. so when I saw a lovely bright red solid it quickly when into the cart. Also like that is double the size of most of the cotton skeins that I have.

Happy Knitting